LaGrange, Wyoming, is a thriving Western community, with tremendous potential for new business development. A healthy mix of long-standing businesses and budding entrepreneurs prosper in this small town. The Town of LaGrange promotes a positive business climate and is continually working toward enhancing the community for current and future residents. Evidence of this planning is seen in the Community Assessment Report by the Wyoming Rural Development Council.

After the community assessment was completed in 2004 several members of the community stepped up to form committees to address the major items discovered in the assessment. (page 24)
Infrastructure • Lack of law enforcement • Telecommunications • Paving the streets • Health care services • Highway safety • Visioning and planning • Storm drainage • Economic Development • Business and Agribusiness development and enhancement • Bank or ATM • Recreation center and programs-swimming pool • Quality of Life • Walking path • Preserve and promote the historical aspects and high school • Town beautification • Community wide programs for children, family, seniors
Reading below, you will see several of the community assessment items being addressed through projects and grants obtained to complete the project if needed. Several projects have been addressed and have been a large asset to the community.
Future Grants/ Projects

Final Closure of Landfill by DEQ
Working to finish landfill closure process per state requirements.
Current Grants/ Projects
LaGrange Water Infrastructure Improvements
LaGrange Water Master Plan was completed in 2021. The purpose for the Master Plan is to serve as a guidance document for maintaining the existing system and planning future improvements. The master plan contains the technical information the Town needs to meet system repair and replacement goals, improve the efficiency of the system operations, and create a sound financial foundation for system maintenance. Evaluations of infrastructure, water sources and financials were performed. After hearing the recommendations from the Level I, Master Plan, the LaGrange Town Council chose to move forward with a Wyoming Water Development Office Level II Feasibility Study in 2023. The Level II study was structured in two phases. Phase I consisting of determining a location for and constructing a new municipal well into the Fox Hill Aquifer. Phase II consisted of analyzing alternatives for the transmission main, water storage tank, and connection of the new well to the system. These Level I Master Plan recommendations are to ensure consumers continue to receive safe drinking water; the town maintains compliance with changing water quality testing requirements and the system will become self-supporting.
Currently, the town of LaGrange has applied for funding to cover construction of a new 12’’ transmission main, additional LF of 6” main to eliminate one booster pump, chlorination loop, a new 500,000-gallon storage tank, purchase/develop the third production well, separate existing wells tying into new third well and new dedicated transmission line, updating SCADA system, meters, valves and fire hydrants. It will also consist of replacing all water meters and adding a new meter reading system.

Benches and swing set
New weather resistant benches to be placed around walk path and a new swing for the town park.
Water Study Phase II
Recommendations from level one; the town needs to address fire flow, water storage and blending.
A new well was drilled and tested. This well was drilled into a different aquafer to assist with providing more fire flow and possibly blending with current wells to meet the changing requirements of EPA. The design of an additional water tower and looping the existing system to provide better water coverage, flow and pressure was also completed in this phase.

Water Study Phase I
Study to assess existing water system and get a master plan for upgrades and replacements.

Walk Path Phase II
An addition to the walk path which is progress to completion of the initial design.

Walk Path Phase I
Built a portion of the walk path using the previously completed design as a part of the town community assessment.

LHS Fitness Equipment
Purchased fitness equipment to replace older damaged equipment.

Main Street Sidewalks
Replaced old and added new sidewalks as well as curb and gutter on main street. Replaced sidewalk at Town Hall and LaGrange Heritage Square.

Water Tower Cathodic Protection
Replaced cathodic protection system in the water tower per inspectors recommendation as the current system was not functioning at 100%.

Chip Seal Street Repair
Chip sealed all paved streets in town as well as parking lots at town hall and community building.

Lagoon Valves
Replaced two influent boxes & valves that operate the lagoons as well as crossover valves that separate the lagoons.

Telemetry System
Purchased a telemetry system which monitors the water tower and water wells.

Town Welcome Sign
Replaced old signs with a new design and landscaping

Sewer line Replacement/ Repair
Replaced 95% of the town sewer system

Medical Clinic Study
Contracted with a company to perform a feasibility study for a medical clinic in LaGrange

Storm Drainage
Main street west to the creek was redesigned and drainage was reshaped around the LaGrange elementary school as well as M street and the War Memorial building with underground storm drainage and a retention pond.

Walk Path Design
After the community assessment, a committee was formed and they produced several options for a walk path. The final design was completed for the next phase, which would be construction

North Sewer & Water Project
Developed already platted town property with water, sewer, streets, electricity and phone.

Generators
Purchased two generators one for booster building and one for water wells.

Landfill closure Study & Permit
Drilled four monitoring wells at the LaGrange landfill per DEQ requirements. Designed options for closure of the landfill.

LHS Windows
Replaced windows in the LaGrange Heritage Square to match the original LaGrange High School design.

LHS Renovation
Purchased and renovated the LaGrange High School into the LaGrange Heritage Square.

Security Siren
Purchased siren and pole for emergency warning system

Park Improvement Project
Added concession stand (Yetter Snack Shack), new bleaches, panels for livestock pens and chutes to the existing arena area.

BWMP
Purchased playground equipment and built a safe playground located near the LaGrange Arena in memory of Bill Ward.

Lift Station replacement
Replaced and relocated the towns first lift station.

Community Assessment
An assessment gathering information from the community, inside LaGrange as well as the surrounding area, then compiling the information to give to the town council as a guide for future economic development for the community.
Thank you!
The below entities helped fund our projects. We greatly appreciate your support.
- State of Wyoming Water Development
- State Lands & Investments Board
- Clean Water State Revolving Fund
- ARPA Funds
- Goshen County Economic Development
- GCED ½ cent sales tax
- Goshen County Recreation Board
- Wyoming Department of Transportation (WYDOT)
- United States Department of Agriculture (USDA)
- Wyoming Business Council
- Community Development Block Grant
- County Wide Consensus Funds
- Wyoming Rural Development
- Department of Homeland Security
- Land & Water Conservation Fund
- 1 Cent Capital Facilities Tax